MPCE are providing technical assistance and third party review services on this project. The project consists of three buildings shared on a common podium structure up to Level 5. The tower building then continues up to the concrete roof at Level 32. The building is of reinforced concrete construction with the core providing the stability against wind and earthquake loads. For this project a full wind study was completed to minimise loads on the structure providing the most efficient structure possible.